Vat Supported Steels


Measurement s were taken and new beams were fabricated. The beams needed to include mounting points for 2 geared motors that sit on the back side.
This was rather critical as the positions here needed to match up with the existing points on the vat when it was reassembled.

The job completed and looking good.
Critical measurements were taken prior to starting the work. Upon completion these measurements were checked to ensure all rolls within the vat were returned to their exact positions.

This is a side view of the new universal beams in position with the vat lowered.